![](https://pirengineering.com/wp-content/uploads/2022/07/image39.jpg)
Siam Bheasach (2019)
Pharmaceutical Factory, Bangkok
Work scope
Job Description: 1,200 sq.m.
Design and Built Pharmaceutical production line Class 100, 10,000, 100,000 Cleanroom.
Low Hum., Cleanroom Class 100,000
HVAC, WFI, PW, Electrical, CDA.
Cleanroom Wall, Floor, Ceiling.
Process machine hook up.
![](http://www.pirengineering.com/wp-content/uploads/2022/07/image46.png)
![](http://www.pirengineering.com/wp-content/uploads/slider/cache/4b38eb6494504ce83d0f59a202fca883/image84.jpg)
![](http://www.pirengineering.com/wp-content/uploads/slider/cache/c75960fd739ef713509d0145050d6ac2/image49.jpg)
![](http://www.pirengineering.com/wp-content/uploads/slider/cache/166a8f0c21085376ee2924ebb1d92d0b/image85.jpg)
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
![The Mysterious Case of Car Design](http://www.pirengineering.com/wp-content/uploads/2022/07/image46.png)
![The Mysterious Case of Car Design](https://www.pirengineering.com/wp-content/uploads/slider/cache/18f7eaf6e61faf4794fff04bc9c92190/image84.jpg)
![The Mysterious Case of Car Design](https://www.pirengineering.com/wp-content/uploads/slider/cache/edce1ca7ea02e256f4fbe628f1e33df1/image49.jpg)
![The Mysterious Case of Car Design](https://www.pirengineering.com/wp-content/uploads/slider/cache/6c45817ae54a073c64f613c11287b840/image85.jpg)
Project Recommend
![Siam Toyota2 (2013) Siam Toyota2 (2013)](http://wp.pirengineering.com/wp-content/uploads/2022/07/mnbmgh.png)
Siam Toyota2 (2013)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
![Siam Toyota (2011) Siam Toyota (2011)](http://wp.pirengineering.com/wp-content/uploads/2022/07/ncnbgdf.png)
Siam Toyota (2011)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
![Ekarat (2008-2009) Ekarat (2008-2009)](http://wp.pirengineering.com/wp-content/uploads/2022/07/dsadc.png)
Ekarat (2008-2009)
New Production, PV Solar cell assembly. Machine installation, CDA, RO water, Electrical, Air condition.
![Triumph Aviation (2005) Triumph Aviation (2005)](http://wp.pirengineering.com/wp-content/uploads/2022/07/bfdfd.png)
Triumph Aviation (2005)
New Factory, Air plane engine repair, 5,500 sq.m. Complete design & Construction for New production facility for, Air condition, Mechanical, Electrical
{"arrow":"true","pagination":"true","speed":"2000","autoplay":"true","autoplay_speed":"3000","loop":"true","owl_slide_to_show":"3","slide_show_ipad_owl":"2","slide_show_tablet_owl":"1","slide_show_mobile_owl":"1","owl_slide_to_scroll":"1","owl_slide_margin":"20","owl_slide_padding":"0","owl_start_slide":"0","owl_slide_center":"false","owl_slide_autowidth":"true","owl_slide_freeDrag":"false","owl_height_auto":"false","caption":false,"owl_slide_rtl":"false"}
{"animation_fancy":"","transition_fancy":"","fancy_box_loop":""}