Rodenstock (2017-2022)

LardkrabangIE , Bangkok

Work scope

  • AHU 2-12 replacement (New year 2018, shutdown)
  • Cleanroom Building 1 Modification
  • Air condition for Casting room improvement
  • Vacuum tank and pipe installation
  • Fresh and Recycle pipe replacement
  • Fire water pipe replacement
  • Toilet renovation
  • Toilet Building 2 & 3 renovation
  • Building 3 Renovation
  • Lighting, Air condition
  • Building 1 and 2: Chilled water loop improvement
  • Building 1-Office area: Air con. Replacement (VRF)
  • Building 2: Process cooling, Warm and Cooling water supply system for new production line
  • Building 2: New year shut down for air-condition of one production line. 
Rodenstockyear-type01-pic02
Rodenstockyear-type01-pic01
Rodenstockyear-type01-pic02
Rodenstockyear-type01-pic01
previous arrow
next arrow

Project Recommend

{"arrow":"true","pagination":"true","speed":"2000","autoplay":"true","autoplay_speed":"3000","loop":"true","owl_slide_to_show":"3","slide_show_ipad_owl":"2","slide_show_tablet_owl":"1","slide_show_mobile_owl":"1","owl_slide_to_scroll":"1","owl_slide_margin":"20","owl_slide_padding":"0","owl_start_slide":"0","owl_slide_center":"false","owl_slide_autowidth":"true","owl_slide_freeDrag":"false","owl_height_auto":"false","caption":false,"owl_slide_rtl":"false"}
{"animation_fancy":"","transition_fancy":"","fancy_box_loop":""}